Hi there,
I’m about to start recording my practical demonstrations for submission however in my workplace at the moment we have no large pool plant systems running.
What (if any) are the requirements needed for the plant for the demonstrations to be carried out on and would it be possible for me to assemble a smaller scale pool plant system for the purposes of the demonstrations with equipment I have available to me here?
If not then would it be best for me to try and organise the demonstration at a different site if possible?
Thanks a lot,
All the best.